Skip to main content

Site Navigation

Your Account

Choose Language

Changes to Step #10

Edit by Christopher Howell

Edit approved by Christopher Howell

Deleted
Added
Unchanged

Step Lines

[title] Ground and Pilot
[* black] Steps and photos coming soongreen] Connect the AC Input Earth Ground to the Ground block.
[* green] Connect the EV Output Earth Ground to the Ground block.
[* violet] Connect the EV Output Control Pilot (CP) to PLT on the OpenEVSE Controller.
[* black] Steps and photos coming soongreen] Connect the AC Input Earth Ground to the Ground block.
[* green] Connect the EV Output Earth Ground to the Ground block.
[* violet] Connect the EV Output Control Pilot (CP) to PLT on the OpenEVSE Controller.

Image 1

No previous image

Added

Image 2

No previous image

Added